Computer Associates
Village of Islandia
Draft and Final EIS
Prepared Draft EIS for major phased expansion of corporate offices of Computer Associates. Project included detailed analysis of building code conformance, site grading and building height/architecture, landscaping and visual resource issues, land use compatibility, economic benefits, and other land use and environmental resource issues to constitute a complete Draft EIS accepted by the Village of Islandia.
Headriver
Town of Riverhead
Draft and Final EIS
Prepared Draft EIS for special permit application to facilitate a lumberyard use on a commercial parcel in the Town of Riverhead. Key issues included sanitary flow, drainage retention, land use and zoning, ecological and other land use and environmental resource issues to constitute a complete Draft EIS accepted by the Town of Riverhead.
Riverhead Marquee
Draft and Final EIS
Prepared EIS for cinema/restaurant project requiring special permit and site plan approval. Key issues involved traffic, visual impacts, land use compatibility, community services and Town land use plans and studies.
Water Mill Shops
Southampton
Draft and Final EIS
Complex EIS involving site specific and cumulative impact analysis associated with controversial retail development on a 3.65 acre site in Water Mill. Directly prepared simulation of nitrogen in recharge, on-site groundwater investigation, visual resource impact analysis and market/economic study. Detailed analyses concerning groundwater-surface water interrelationship, and cumulative groundwater, traffic and economic impacts were conducted. Project constructed as model downtown revitalization project with “smart growth” elements and design.
Village Square
Speonk, Town of Southampton
Draft EIS
Preparation of a Draft EIS for retail shopping center in hamlet of Speonk. Primary issues of the project involve integration into community, cultural/aesthetic/visual resources, traffic, economic effects and water resource impacts.
Hewlett Woodmere School District
Draft EIS
Prepared Draft EIS for school district middle school expansion. Project included detailed analysis of potential water resource impacts, drainage, traffic impacts, and other land use and environmental resource issues to constitute a complete Draft EIS accepted by the State Education Department.
Center Moriches School District
Draft EIS
Prepared Draft EIS for school district high school expansion. Project included detailed analysis of grading and drainage, ecology, traffic, and other land use and environmental resource issues to constitute a complete Draft EIS accepted by the State Education Department.
Old Orchard Woods
Town of Huntington
Draft and Final EIS
Prepared Draft and Final EIS for 22 unit subdivision project on Eatons Neck overlooking Huntington Bay. Key issues included beach erosion, bluff recession, shoreline protection, long shore drift and drainage system design, unique forest and vegetation inventories, road access geometry, site wildlife and ecology, visual resources, and other land use and environmental resource issues to constitute a complete Draft and Final EIS accepted by the Town of Huntington.
Baldwin Public Library Expansion
Draft EIS
Prepared Draft EIS for library district library expansion. Project included detailed analysis of architectural and aesthetics, land use compatibility, potential traffic impacts, sanitary flow and drainage, as well as other land use and environmental resource issues to constitute a complete Draft EIS accepted by the State Education Department.
Hren Property
Town of Huntington
Draft and Final EIS
Prepared Draft and Final EIS for commercial rezoning application and residential subdivision, including detailed analysis of land use and zoning, soil quality, traffic impacts, visual resources, municipal plan conformance, and related EIS required documentation.
Western Suffolk B.O.C.E.S.
James Allen Elementary School
Draft EIS
Prepared Draft EIS for B.O.C.E.S. school expansion. Project included detailed analysis of site coverage changes, visual resource analysis, land use compatibility, traffic circulation and other land use and environmental resource issues to constitute a complete Draft EIS accepted by the State Education Department.
Harborfield Estates
Town of Huntington
Draft and Final EIS
Completed Draft and Final EIS for residential subdivision change of zone, including park design, cultural resource evaluation, land use compatibility study, traffic impact study and related EIS required documentation.
Knightsbridge Gardens
Village of Great Neck Plaza
Draft and Final EIS
Project involved Draft and Final EIS, project design plans, erosion control plans and traffic impact study for proposed 40-unit addition to a garden apartment complex. Detailed analyses included visual impact study, shadow study, stormwater, drainage and grading issues and transportation access.
CVS
Greenlawn, Town of Huntington
Draft and Final
Completed Draft and Final EIS for CVS pharmacy store with critical issues analysis including traffic, community character, visual impacts, tax revenue and community service issues and primarily human resource issues.
PJ Venture SCB Change of Zone
Smithtown
Draft and Final EIS
Preparation of complete Draft EIS for change of zone project in the Town of Smithtown. Project included microcomputer models as follows: Simulation of Nitrogen in Recharge, Tax Revenue Assessment Procedure, Vehicle Air Emissions, and Prediction of Wildlife Ecological Response. All aspects of the Draft EIS were analyzed and included in document format acceptable to the Town of Smithtown.
Camelot Village
Town of Huntington
Draft and Final EIS
Completed Draft and Final EIS of 10 acre assisted living community. Critical issues included wetlands, endangered species, slopes, drainage and erosion control and visual impacts.
Airport International Plaza
Town of Islip
Draft and Final EIS
Completed Draft EIS of 39 acre industrial subdivision for industrial and office use in proximity to Long Island MacArthur Airport, Islip. Issues included appropriate use, industrial corridor landscape design, traffic and water resource impacts.
Price Club
New Rochelle, Westchester County
Draft and Final EIS
Preparation of Draft and Final EIS for 135,000 square foot wholesale club. Primary issues of the project involve noise impacts, air impacts, land use compatibility and flood control.
Commack Campus Park
Smithtown
Draft and Final EIS
Draft EIS for a 42 acre change of zone from R-10 residential to LI Industrial. Significant issues including: land use compatibility, cumulative impacts, air and water resource impacts, ecology and traffic, were analyzed in detail.
Dowling College NAT Center
Brookhaven
Draft and Final EIS
Draft and Final EIS for 105 acre land transfer to facilitate construction of a National Aviation and Transportation educational campus. Project involved analysis of issues including: noise, air emission, land use compatibility, groundwater protection, site ecology, and socio-economic impacts.
Round Hill at Old Westbury
Nassau County
Draft and Final EIS
Draft and Final EIS for 100 acre residential housing project, on portion of original W.C. Whitney estate, Village of Old Westbury. Key issues involved; water supply, site ecology and unique vegetation, and cumulative impacts.
Angel Shores
Southold
Final EIS
Prepared, on behalf of the Southold Planning Board, a Final EIS for a controversial project in the Hamlet of Southold. Project involved response to 171 comments on a Draft EIS prepared and submitted by others. Key issues involved salt-water intrusion, groundwater quality/quantity, Maritime Red Cedar Forest and unique ecological habitat protection, and open space configuration. Project included preparation of three (3) alternative design plans as mitigation to achieve sound environmental planning.
All Island Demolition
Yaphank, Brookhaven
Jo-Com Trucking
Holbrook, Islip
AVP Sanitation
Bay Shore, Islip
Draft EIS
Draft Environmental Impact Statements for three individual transfer station/recycling center facilities. Issues concerning land use compatibility, site operations, noise, dust, air and odor impacts, groundwater impacts, and solid waste management policy and planning were addressed in detail.
|